System APOT-90 (0:53:30) exceeds the 30-minute target — engage the hospitals with the longest offload times on throughput.
Pinecrest General Hospital APOT-90 is 1:51:12 (81.1 excess hrs, $20,275) — an outlier warranting a facility-level conversation.
39.4% of offloads exceed the 25-minute benchmark, above the 10% ceiling.
Summit Medical Transport absorbed the most wall time — 33.6 excess hours ($8,400) this month.